Solar grid capacity
Is there room for solar at your substation?
An unlicensed solar application in Turkey needs free capacity at the substation you connect to. Here is the remaining distribution-level capacity announced by TEİAŞ (Turkey's transmission system operator), by province and substation.
TEİAŞ announcement: October 1, 2026 · Announcement · Official table (PDF, Turkish)
Remaining capacity in our region (Fırat EDAŞ)
- Malatya4.21 MWeRoom at 4 substations
- Elazığ5.45 MWeRoom at 3 substations
- Bingöl1.52 MWeRoom at 2 substations
- Tunceli1.00 MWeRoom at 1 substation
By substation
| Substation | Distribution (EDAŞ) |
|---|---|
| ARAPGİR HAVZA TMFırat EDAŞ | 1.00 MWe |
| BEYDAĞI TMFırat EDAŞ | Full |
| DARENDE TMFırat EDAŞ | Full |
| HASAN ÇELEBİ TMFırat EDAŞ | Full |
| MALATYA-1 TMFırat EDAŞ | 0.02 MWe |
| MALATYA-2 (ÖZAL) TMFırat EDAŞ | 0.45 MWe |
| MALORSA TMFırat EDAŞ | 2.74 MWe |
| YAZIHAN HAVZA TMFırat EDAŞ | Full |
| Total | 4.21 MWe |
Across Turkey
625.11 MWe of distribution-level capacity remains, with room at 460 substations. Provinces with the most left:
- İstanbul55.57 MWe
- Ankara54.33 MWe
- İzmir40.02 MWe
- Karaman31.92 MWe
- Mersin25.10 MWe
- Kütahya20.30 MWe
- Bursa18.79 MWe
- Gaziantep18.05 MWe
- Kocaeli17.70 MWe
- Şanlıurfa12.73 MWe
Figures are read automatically from TEİAŞ's PDF table, and a new announcement is checked for daily. Because the table uses merged cells, a value can occasionally land on a neighbouring substation in the same province; check the official table before applying. The distribution company gives the binding connection opinion. The OSB column applies only to plants inside organised industrial zones.